
Aliencell X1 Air-Pro Combo
ETA: DE 2–5 Business Days | EU 5–8 Business Days
ETA: DE 2–5 Business Days | EU 5–8 Business Days
What's Special About X1?
Real-time position syncing between the laser head, touchscreen, and software gives you full alignment confidence. What you see is exactly where it goes — no guesswork, just precision.
Hear What the Experts Say
Discover the Sleek Design and Outstanding Performance of Aliencell X1
FAQs
The choice depends on your specific needs:
- 60W offers the highest power and is ideal for cutting needs. If you have high cutting demands, we recommend the 60W machine.
- 20W is more suitable for precision engraving, offering fine detail work.
- 40W offers a balance between cutting and engraving, providing a compromise between power and fine detail.
Our machines support over 300 materials, including:
- Engraving & Cutting: Wood, Opaque Acrylic, Leather, Cardboard, Paper, Delrin, Cork, and more.
- Engraving Only: Slate, Titanium, Aluminum, Marble, Ceramic, and more.
Working Area
- 20W & 40W: 24,0 × 18,3 in (610 × 465 mm)
- 60W: 23,4 × 17,9 in (595 × 455 mm)
Max Material Thickness
- 0,1–25 mm (Slats Mode): Cutting & engraving. Recommended for precise cutting work.
- 20–50 mm (Flat Base Mode): Engraving & marking only. Recommended for thicker or uneven materials.
See the Aliencell Wiki for more details.
Absolutely! The Aliencell X1 machine is designed to help both beginners and experts with its innovative features:
- Automatic parameter recommendations with Aliencell Space and real-time rendering previews to help you quickly set the right parameters.
- No manual calibration required with the dual 8MP cameras and cross laser for precise material alignment.
- Auto focus and one-click repeat processing to help you quickly start and repeat your jobs.
- User-friendly touchscreen with one-click self-check, 10 flame sensors, and real-time air quality detection to ensure safe and smooth operation.
- Dimensions: 35,6 × 31,0 in (903 × 787 mm)
- Net Weight: 65,0 lbs (29,5 kg)
To accommodate the machine, exhaust fan, and air pump, we recommend a minimum workspace of 38 × 35 inches (965 × 889 mm), with 40 × 35 inches (1016 × 889 mm) being ideal for a more comfortable setup.
Laser module lifespan: Up to 10.000 hours.
Yes. It is currently available for pre-order. Estimated shipping: Sept–Oct (Europe). For full details, please refer to the product link.
We currently ship to the following European countries: Austria, Belgium, Bulgaria, Czech Republic, Denmark, Estonia, Finland, France, Germany, Greece, Hungary, Ireland, Italy, Latvia, Lithuania, Luxembourg, Netherlands, Poland, Portugal, Romania, Slovakia, Slovenia, Spain, and Sweden.
Coverage varies by product. Enjoy expert support, remote diagnosis, and repair, replacement, or refund for eligible items—fully respecting your statutory consumer rights. See our Warranty Policy for product-specific periods and regional details.
- Choosing a selection results in a full page refresh.
- Opens in a new window.